Skip to main content
Cornell University
Library
Cornell University
Library
Digital Collections
Menu
History
All collections
search for
Search in
All Fields
Title
Author
Subject
for
Search
Search tip
Search Constraints
Start Over
You searched for:
Subject
production processing
Cornell University Library Digital Collections
Limit your search
Collection
Early 20th Century Engineering Lantern Slides
7
Format
Image
7
Date Range
Date Range range begin
Date Range range end
View larger »
[Missing]
7
Agent
unknown
7
Work Type
diagrams
3
drawings (visual works)
3
photographs
1
Subject
lean manufacturing
3
mass production
7
production processing
✖
[remove]
7
industiral engineering
3
industrial engineering
4
more
Subject
»
Repository
Division of Rare and Manuscript Collections, Cornell University Library
7
Archival Collection
Sibley School of Mechanical and Aerospace Engineering records, 1917-2009
7
Set
Plant Layout
7
1
-
7
of
7
Sort
by relevance
relevance
year (descending)
year (ascending)
title (a to z)
title (z to a)
author (a to z)
Number of results to display per page
10
per page
per page
10
per page
20
per page
50
per page
100
per page
View results as:
List
List
Maps
Map
Gallery
Gallery
Search Results
1.
Picture showing the straight-line method of controlling forms reduced the number from 21 to 10 forms. It also reduced the amout of paper from 67,000 to 3,000 annually.
Collection:
Early 20th Century Engineering Lantern Slides
Set:
Plant Layout
Date:
undated
Format:
Image
Agent:
unknown
2.
Plant layout showing conveyor belt configured for 12 workers, and another layout doing the same work, configured for 6 workers.
Collection:
Early 20th Century Engineering Lantern Slides
Set:
Plant Layout
Date:
undated
Format:
Image
Agent:
unknown
3.
Plant layout showing conveyor belt configured for 12 workers, and another layout doing the same work, configured for 6 workers.
Collection:
Early 20th Century Engineering Lantern Slides
Set:
Plant Layout
Date:
undated
Format:
Image
Agent:
unknown
4.
Bracket machining group layout configured for 9 workers and another layout doing the same work configured for 4 workers.
Collection:
Early 20th Century Engineering Lantern Slides
Set:
Plant Layout
Date:
undated
Format:
Image
Agent:
unknown
5.
Straight-line method of manufacturing a shaft by shifting work to all on one floor.
Collection:
Early 20th Century Engineering Lantern Slides
Set:
Plant Layout
Date:
undated
Format:
Image
Agent:
unknown
6.
Present operation on a shaft with 20 steps along with proposed revised operation with fewer (11) steps.
Collection:
Early 20th Century Engineering Lantern Slides
Set:
Plant Layout
Date:
undated
Format:
Image
Agent:
unknown
7.
Production of shafts through 4 floors of factory buiding.
Collection:
Early 20th Century Engineering Lantern Slides
Set:
Plant Layout
Date:
undated
Format:
Image
Agent:
unknown