Search Results
22. Bracket machining group layout configured for 9 workers and another layout doing the same work configured for 4 workers.
23. Present operation on a shaft with 20 steps along with proposed revised operation with fewer (11) steps.
24. Plant layout of work to be inspected with labels.
25. Plant layout of work to be cleaned, inspected, and reinspected.
- « Previous
- Next »
- 1
- 2
- 3 Current Page, Page 3