Search Results
2. Schematic drawing showing flow with arrows of a specific part with proposed rearrangement.
3. Drawing showing factory plant layout next to the Nashua River.
4. Drawing showing old and new method of motor-frame machine group
5. Picture showing the straight-line method of controlling forms reduced the number from 21 to 10 forms. It also reduced the amout of paper from 67,000 to 3,000 annually.
6. Plant layout showing conveyor belt configured for 12 workers, and another layout doing the same work, configured for 6 workers.
7. Plant layout showing conveyor belt configured for 12 workers, and another layout doing the same work, configured for 6 workers.
8. Bracket machining group layout configured for 9 workers and another layout doing the same work configured for 4 workers.
9. Straight-line method of manufacturing a shaft by shifting work to all on one floor.
10. Present operation on a shaft with 20 steps along with proposed revised operation with fewer (11) steps.
- « Previous
- Next »
- 1 Current Page, Page 1
- 2