Skip to main content
Cornell University
Library
Cornell University
Library
Digital Collections
Menu
History
All collections
search for
Search in
All Fields
Title
Author
Subject
for
Search
Search tip
Search Constraints
Start Over
You searched for:
Set
Plant Layout
Cornell University Library Digital Collections
Limit your search
Collection
Early 20th Century Engineering Lantern Slides
13
Format
Image
13
Date Range
Date Range range begin
Date Range range end
View larger »
[Missing]
13
Agent
unknown
13
Work Type
drawings (visual works)
7
diagrams
5
photographs
1
Location
Nashua River, Massachussetts
1
Subject
factories
2
lean manufacturing
4
mass production
11
plant design
2
production processing
7
more
Subject
»
Repository
Division of Rare and Manuscript Collections, Cornell University Library
13
Archival Collection
Sibley School of Mechanical and Aerospace Engineering records, 1917-2009
13
Set
Plant Layout
✖
[remove]
13
« Previous |
1
-
12
of
13
|
Next »
Sort
by relevance
relevance
year (descending)
year (ascending)
title (a to z)
title (z to a)
author (a to z)
Number of results to display per page
12
per page
per page
12
per page
24
per page
48
per page
100
per page
View results as:
List
List
Maps
Map
Gallery
Gallery
Search Results
1.
Drawing of 5 floors in a plant in relation to Main Street.
Collection:
Early 20th Century Engineering Lantern Slides
Set:
Plant Layout
Date:
undated
Format:
Image
Agent:
unknown
2.
Schematic drawing showing flow with arrows of a specific part with proposed rearrangement.
Collection:
Early 20th Century Engineering Lantern Slides
Set:
Plant Layout
Date:
undated
Format:
Image
Agent:
unknown
3.
Drawing showing factory plant layout next to the Nashua River.
Collection:
Early 20th Century Engineering Lantern Slides
Set:
Plant Layout
Location:
Nashua River, Massachussetts
Date:
undated
Format:
Image
Agent:
unknown
4.
Drawing showing old and new method of motor-frame machine group
Collection:
Early 20th Century Engineering Lantern Slides
Set:
Plant Layout
Date:
undated
Format:
Image
Agent:
unknown
5.
Picture showing the straight-line method of controlling forms reduced the number from 21 to 10 forms. It also reduced the amout of paper from 67,000 to 3,000 annually.
Collection:
Early 20th Century Engineering Lantern Slides
Set:
Plant Layout
Date:
undated
Format:
Image
Agent:
unknown
6.
Plant layout showing conveyor belt configured for 12 workers, and another layout doing the same work, configured for 6 workers.
Collection:
Early 20th Century Engineering Lantern Slides
Set:
Plant Layout
Date:
undated
Format:
Image
Agent:
unknown
7.
Plant layout showing conveyor belt configured for 12 workers, and another layout doing the same work, configured for 6 workers.
Collection:
Early 20th Century Engineering Lantern Slides
Set:
Plant Layout
Date:
undated
Format:
Image
Agent:
unknown
8.
Bracket machining group layout configured for 9 workers and another layout doing the same work configured for 4 workers.
Collection:
Early 20th Century Engineering Lantern Slides
Set:
Plant Layout
Date:
undated
Format:
Image
Agent:
unknown
9.
Straight-line method of manufacturing a shaft by shifting work to all on one floor.
Collection:
Early 20th Century Engineering Lantern Slides
Set:
Plant Layout
Date:
undated
Format:
Image
Agent:
unknown
10.
Present operation on a shaft with 20 steps along with proposed revised operation with fewer (11) steps.
Collection:
Early 20th Century Engineering Lantern Slides
Set:
Plant Layout
Date:
undated
Format:
Image
Agent:
unknown
11.
Production of shafts through 4 floors of factory buiding.
Collection:
Early 20th Century Engineering Lantern Slides
Set:
Plant Layout
Date:
undated
Format:
Image
Agent:
unknown
12.
Plant layout of work to be inspected with labels.
Collection:
Early 20th Century Engineering Lantern Slides
Set:
Plant Layout
Date:
undated
Format:
Image
Agent:
unknown
« Previous
Next »
1
Current Page, Page 1
2